Refine your search:     
Report No.
 - 
Search Results: Records 1-3 displayed on this page of 3
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Annual data compilation of water balance observation in the Regional Hydrogeological Study Project (RHS Project); For the fiscal year 2014

Ueno, Tetsuro; Takeuchi, Ryuji

JAEA-Data/Code 2015-032, 30 Pages, 2016/03

JAEA-Data-Code-2015-032.pdf:9.65MB
JAEA-Data-Code-2015-032-appendix(CD-ROM).zip:593.7MB

Tono Geoscience Center of Japan Atomic Energy Agency (JAEA) has carried out the subsurface water balance observation in order to estimate groundwater recharge rate for setting the upper boundary conditions on groundwater flow simulation and to obtain data for calibration of hydrogeological model. In the subsurface water balance observations, precipitation data and river flowrate have been observed in the Garaishi River and Hiyoshi River watersheds. The missing or abnormal data in the monitoring data during the fiscal year 2014 were complemented or corrected, and these data were compiled in data set. Because many data were accumulated, these observations were finished in the end of March, 2015.

JAEA Reports

Annual data compilation of water balance observation in the Mizunami Underground Research Laboratory Project (MIU Project); For the fiscal year 2014

Ueno, Tetsuro; Takeuchi, Ryuji

JAEA-Data/Code 2015-031, 61 Pages, 2016/03

JAEA-Data-Code-2015-031.pdf:9.15MB
JAEA-Data-Code-2015-031-1appendix(DVD-ROM).zip:174.29MB
JAEA-Data-Code-2015-031-2-1appendix(DVD-ROM).zip:86.67MB
JAEA-Data-Code-2015-031-2-2appendix(DVD-ROM).zip:268.33MB
JAEA-Data-Code-2015-031-2-3appendix(DVD-ROM).zip:569.4MB
JAEA-Data-Code-2015-031-2-4appendix(DVD-ROM).zip:103.25MB
JAEA-Data-Code-2015-031-2-5appendix(DVD-ROM).zip:0.4MB

Tono Geoscience Center of Japan Atomic Energy Agency (JAEA) has carried out the subsurface water balance observation in order to estimate groundwater recharge rate for setting the upper boundary conditions on groundwater flow simulation and to obtain data for calibration of hydrogeological model. In the subsurface water balance observations, meteorogical data, river flow rate, groundwater level and soil moisture have been observed in the Shoma River watershed, the Shoma River model watershed and the MIU Construction Site. After missing or abnormal data in the monitoring data from the fiscal year 2014 were complemented or corrected, the data were compiled in data set. Furthermore the groundwater recharge rates in the Hazama River watershed were calculated using the river flow rate data obtained from the environment survey in the MIU construction work in the fiscal year 2014. Because many data were accumulated, these observations were finished in the end of March, 2015.

JAEA Reports

Installation of Subsurface Hydrological Monitoring System in Regional Hydrogeological Study

Toyama, Shigeyuki*; Wakamatsu, Hisanori; Okazaki, Hikoya

JNC TJ7440 99-031, 22 Pages, 1999/09

JNC-TJ7440-99-031.pdf:6.36MB

no abstracts in English

3 (Records 1-3 displayed on this page)
  • 1